Event location on the map: भोटे कोशी, Khumbupasanglahmu-05, Thamo, खुम्बु पासाङल्हामु गाउँपालिका, सोलुखुम्बु जिल्ला, कोशी प्रदेश, नेपाल
Natural hazardfloodroadlandslide
August 27, 2026 · Nepal

Catastrophic flooding in Nepal

© OSM · OpenTopoMap (CC-BY-SA)

भोटे कोशी, Khumbupasanglahmu-05, Thamo, खुम्बु पासाङल्हामु गाउँपालिका, सोलुखुम्बु जिल्ला, कोशी प्रदेश, नेपाल

Event date: Published:

What happened? According to Nepali media reports, the disaster is attributed to the collapse of a large ice-rock massif that temporarily blocked a mountain stream and then burst in a wave down the Bhote-Koshi-Trishuli-Narayani system. More recent assessments interpret the seismic signal as the result of a collapse, not an earthquake; the exact point and side of the source boundary are described differently.

The water crossed the country in hours. At 09:05 the water entered from the Tibetan side, and by 15:20 it had already traveled about 181 km along its course to the Narayani near Devghat - the river then flows to the border with India.

Why is this a tourist story? The disaster did not happen "somewhere on the border", but the flood passed through the entire country in half, from Tibet to the Indian border. It affected important transport hubs, washed away numerous bridges and roads and entire villages. Therefore, Rasuwa-Kerung, Syabrubesi, Pokhara and Chitwan are not a random list of place names, but interconnected points of the route used by tourists, pilgrims and locals. Through Rasuwa-Kerung, tourists return from the Kailash circuit; trekking to Langtang begins near Syabrubesi, and the Trishuli Valley connects this area with Pokhara - the start of trekking to Annapurna - and Chitwan, a national park with jungles, elephants and rhinos. Damage to roads and communications here can isolate travelers.

Pilgrims. August 28 was considered an auspicious date for Hindus, Buddhists, and followers of animist traditions. Thousands of people made their way to Gosaikunda; Indian pilgrims traveled via Rasuwa-Kerung to Manasarovar in China.

According to the Nepal Tourism Board (NTB):

This is a status of no contact, not a confirmed loss. The destruction of roads and networks, as well as the presence of some people on the route across the Chinese border, may explain some of these cases; this does not allow conclusions to be drawn about the fate of a specific person.

Flood wave path

Flood wave path
  • 08:40 — Syabrubesi: The last reading from the river station before data transmission was lost.
  • 08:50 — Syabrubesi: The station stopped transmitting data.
  • 09:05 — Rasuwagadhi: Reports said a major wave entered from the Tibetan side.
  • 09:20 — Betrawati: The hydrological station stopped transmitting data.
  • 10:28 — Galchhi: A forecast for the wave's movement to this sector was published.
  • 11:26 — Phurke / Malekhu: The level at the Phurke–Malekhu gauge exceeded the danger mark.
  • 11:50 — Malekhu: The wave's arrival at Malekhu was confirmed in a report.
  • 13:00 — Muglin: The wave passing through Muglin was confirmed.
  • 14:14 — Kalikhola: The level at the Kalikhola gauge exceeded the danger mark.
  • 15:20 — Narayani–Devghat: The wave's arrival at Narayani–Devghat was confirmed.
  • 16:00 — Devghat: The peak level was recorded at the Devghat gauge.

← All news

Join a trip

Leave a contact - we’ll send details and help you pick a trip.

Leave a phone or email - whichever suits you

By submitting, you agree we may use your contact to reply.