Near Cape Town, on Table Mountain, aviation is being used and certain areas are being closed off
Large-scale technical work has begun at Table Mountain National Park to upgrade tourism infrastructure and increase safety for the influx of visitors. Specialists are repairing trails, replacing wooden decks, and restoring damaged structures.
Helicopters have been deployed to deliver construction materials to the Echo Valley and Back Table Plateau areas, carrying new stair and floor elements, and to assist in removing the remains of burned structures from the McLears Beacon area. Tourist routes remain open during flights, but visitors are asked to maintain a safe distance from aircraft and follow the instructions of ground staff.
A number of locations are temporarily closed: the Willis Walk deck near the Boulders penguin colony is closed every evening between 7:00 PM and 8:30 PM, requiring detours to access the beach. The Newlands picnic area is closed for recreation due to the RMB Ultra-trail Cape Town, and the Silvermine main gate and ticket office are closed for two days to allow the asbestos roof to be safely replaced. Access to this part of the range remains open through other entrances, including the east gate, during the works.
Source: SANParks announces Table Mountain maintenance and closures - Cape Town ETC
Context
Table Mountain National Park is located entirely within Cape Town and extends along the entire Cape Peninsula to the Cape of Good Hope. Its pedestrian infrastructure is heavily used with over four million visitors each year, and is also subject to strong winds and fog. The provision of wooden decks and steps helps to control soil erosion and protects the endemic fynbos vegetation from trampling.