In English Lake District, a pedestrian bridge washed away by water eleven years ago will be returned
The National Trust organization has received permission to restore a wooden pedestrian bridge Chicken Bridge over a stream Coledale Beck on the western outskirts of the village Braithwaite. The structure was washed away by floods during the devastating Storm Desmond in 2015.
The loss of the crossing forced pedestrians and tourists to use a detour along the roadway without a sidewalk to reach the trail to Force Crag Mine and the wider trail network. Local authorities approved the project, emphasizing that the new structure would eliminate the danger of pedestrians being hit by vehicles.
The project involves the construction of a single-span wooden crossing, similar to typical bridges in the region. Although the site is located in a flood risk area and adjacent to the Buttermere Fells and Lake District High Fells conservation areas, environmental agencies have withdrawn their initial objections after agreeing measures to protect the river from pollution and control invasive species.
Source: Lake District's historic 'Chicken Bridge' to return 11 years after Storm Desmond - NW Mail
Context
The crossing at this site has been in operation since at least the mid-19th century and has been rebuilt several times due to wear and tear and bad weather. The unusual name "Chicken Bridge" is recorded in ancient property deeds, where local residents were separately granted the right to drive poultry across the water.